您的账号已在其他设备登录,您当前账号已强迫下线,
如非您本人操作,建议您在会员中心进行密码修改

确定
收藏 | 浏览0

The degradation of water source environment becomes serious problems accompanying with rapid urbanization in China. Ecological engineering provides ecologically sound and cost-effective solution to solving this problem. As a case study, a 15 hm2 ecological water storage basin for a water plant was designed and constructed on the TEDA area in Tianjin City. Located on saline, the construction of this project has to face serious difficulties, such as high salinity, scarce seed banks of macrophytes, and strong winds. Freshwater replacement, soil amendation and macrophytes planting at the basinshore, wooden water breaker and plastic membrane installation and other measures were conducted for the assistance of plant community establishment. The result showed that the chloride concentration in the basin water decreased from 11600 mg/L to less than 100 mg/L, and the chloride content in the basin sediment decreased from 2.1

作者:Ping-ping, Liu;Cheng-qing, Yin;Jiu-hui, Qu;Guang-yun, Zhang;Wen-qing, Feng;Jun-xin, Liu;Zhi, Zhong

来源:Journal of environmental sciences (China) 2005 年 17卷 1期

知识库介绍

临床诊疗知识库该平台旨在解决临床医护人员在学习、工作中对医学信息的需求,方便快速、便捷的获取实用的医学信息,辅助临床决策参考。该库包含疾病、药品、检查、指南规范、病例文献及循证文献等多种丰富权威的临床资源。

详细介绍
热门关注
免责声明:本知识库提供的有关内容等信息仅供学习参考,不代替医生的诊断和医嘱。

收藏
| 浏览:0
作者:
Ping-ping, Liu;Cheng-qing, Yin;Jiu-hui, Qu;Guang-yun, Zhang;Wen-qing, Feng;Jun-xin, Liu;Zhi, Zhong
来源:
Journal of environmental sciences (China) 2005 年 17卷 1期
The degradation of water source environment becomes serious problems accompanying with rapid urbanization in China. Ecological engineering provides ecologically sound and cost-effective solution to solving this problem. As a case study, a 15 hm2 ecological water storage basin for a water plant was designed and constructed on the TEDA area in Tianjin City. Located on saline, the construction of this project has to face serious difficulties, such as high salinity, scarce seed banks of macrophytes, and strong winds. Freshwater replacement, soil amendation and macrophytes planting at the basinshore, wooden water breaker and plastic membrane installation and other measures were conducted for the assistance of plant community establishment. The result showed that the chloride concentration in the basin water decreased from 11600 mg/L to less than 100 mg/L, and the chloride content in the basin sediment decreased from 2.1